Here you find more photos we took in December 2006.

Location: Lansingh-Zuid, Krimpen aan den IJssel
 


Per page, the photos up to the space are about "our" block.  Sometimes after such space, you'll find common photos but this time, again we have too many so they will appear on their own page again.

The photos below were taken between December 12 & 15, 2006.

And yes, than became visible where the bathroom sides will come and sort of the nerve centre of all pipes and hoses in the space below the stairs.
The other two photos are taken from a 8th level in a compartment block nearby and show all from a different angle...
As of photo 5 you see the preparations for the flooring that will be done Monday, December 18; the black concreet hose along the stairs and all those like water, gas and electricity wiring all there where walls will be and both on the attick and second floor now also is a safety fence aside the stairs.


When you point at a small pic you will get to see the larger one below.

(Tip: scroll until you get the little images on top of this screen)
 

 

 

 

 

 

 

 

 

 

 

 

 



 

Last updated by kimopo on 12.18.2006

Copyright © 2005 [ Kimopo, Rotterdam ]